29.4.15

Earnest Training Begins

With the start of the Giro d'Italia just 10 days away, the team members at the Cosmodrome are practicing their Heavy Drops and re-entry techniques with the assistance of the Space Patrol and its patented Rocket Launch Platform (RLP).  HL88 Engineers have decided that the most efficient preparation for the extreme cycling G-forces caused by acceleration and deceleration can be recreated using this technically advanced device.

23.4.15

Race Radio

Walter Teague 1936 radio design for Sparton Corp.  Wood, glass & metal.  

19.4.15

Lion's Gate to Gravel Pit

Impressive Italianate entrance on the ride today. 


12.4.15

STAGE 6

HL88 FACTOID:  These stage 6 bananas are giving off minute amounts of radiation as they rot into banana bread.


7.4.15

Safety Through Better MOJO

Green Strong Man MOJO has been added at the WORC. Lampo Bianco's technicians worked tirelessly to complete the modifications. As a result, all is well on the western front.